Pemeriksaan Fisik / Verifikasi Teknis

Berdasarkan STO (terkait VO → VR → JO). Setelah lolos → Draft → Final → LS.

Alur dokumen (saling terkait)

Profiling Penawaran VR VO STO Pemeriksaan Fisik Draft Final LS
JO: JO-202310-001 VR: VR-202310-002 VO: VO-202310-002 STO: STO-202310-002

Total Inspeksi (Bulan Ini)

45

Lolos QC (Sesuai Standar)

38

Ada Temuan (Findings/Reject)

7

Tgl Inspeksi Referensi STO Siklus Inspektur (PIC) Hasil / Status QC Aksi
26 Okt 2023, 10:00 STO-202310-002 PT Surya Tekstil Indah Cycle 1 Arif Gunawan Lolos (Passed)
25 Okt 2023, 14:30 STO-202310-001 Hangzhou Steel Corp., Ltd Cycle 1 Chen Wei (CHN-HZ) Temuan (Failed)
27 Okt 2023, 09:00 STO-202310-001 Hangzhou Steel Corp., Ltd Cycle 2 Chen Wei (CHN-HZ) Lolos (Passed)